An early-stage lithium brine exploration project on the northeastern edge of the Salar de Atacama, home to the world's largest high-grade lithium brine operations. Surface sampling shows strong lithium, potassium and boron anomalies over the core claims.
The Salar de Atacama hosts the largest and highest-grade lithium brine reserves in the world. Its northern edge, where Luna sits, is the first area to receive lithium-, potassium- and boron-rich waters carried by the San Pedro River from the El Tatio geyser field.
Strong surface anomalies point to a possible lithium brine horizon at depth, to be tested by drilling.
Potash values up to ~1.8% K in surface samples; a by-product of brine operations.
Boron up to 4,830 ppm in the strongest anomaly; used in fertilizers and industry.
Detected consistently in 2024 samples (54–95 ppm); rare earths also detected and to be confirmed.
Regional evidence at depth: government (DGA) geophysics on the eastern border of the salar interpreted saline water and brine aquifers up to 40 m thick between about 80 and 200 m depth, with wells producing over 30 m³ per minute.
This is regional data, not drilling on Luna. No drilling has been done on the property yet and no mineral resources have been estimated.
Soil and sediment campaigns in 2019 and 2021, plus a 2024 verification visit, were analyzed by ALS Patagonia, a laboratory certified to ISO/IEC 17025. The strongest results sit in the western and central claims.
Highest lithium values in surface samples (ppm Li). Surface geochemistry indicates potential; it does not measure brine grades.
In September 2026 the owner concentrated the property on the claims holding the main anomalies, dropping peripheral areas with weak results.
Core claims retained:
Direct Lithium Extraction (DLE) needs far less surface than traditional evaporation ponds, with reported recoveries above 90% in weeks instead of months. A compact, well-targeted property fits that model and lowers annual holding costs.
Luna lies at 2,300–2,400 m on a gentle plain, surrounded by concessions held by SQM, Wealth Minerals and others.
High-voltage towers run along the property's western boundary (connection not guaranteed).
Dirt tracks reach almost the entire property.
Against ~2,340 mm/yr of evaporation; work is possible year-round.
The technical report recommends the following program to test the brine potential at depth.
The report identifies matters to manage as the project advances.
No drilling or resource estimate yet; the brine horizon is a hypothesis to be tested.
Boundaries of the nearby Los Flamencos National Reserve should be confirmed.
Early engagement with local Indigenous communities is recommended.
Technical report, laboratory certificates, claim records and maps are available to qualified parties.
Source: NI 43-101 Technical Report on the Luna Lithium Project (effective June 2022, updated September 2024) and Appendix A (September 30, 2026), prepared for Global Assistance SpA by Marcial Vergara M., Qualified Person, Chilean Mining Commission Registry No. 0078. Luna is an early-stage exploration project: no drilling has been completed and no mineral resources or reserves have been estimated. Results are from surface soil and sediment samples and do not represent brine grades. Regional data from third parties is for context only. Distances are approximate. This page is a summary and does not replace independent technical, legal or financial review.