A consolidated mining property in one of Chile's most active copper districts, with a modeled copper resource, gold, molybdenum and iron in the same system, and ports, power and water within about 20 km.
Copper is the quantified resource today. The technical report also confirms a Cu-Au-Fe-(Mo) iron oxide copper-gold system, which gives the project additional upside to test.
303.75 Mt at 0.99% CuT across four modeled domains. The only metal quantified in the 2026 estimate.
Gold identified in polished sections with quartz, plus historical gold assays in selected samples.
Local molybdenite and geochemical assays confirm molybdenum in part of the system.
Magnetite and hematite are recurring components of the system's architecture.
Historical data to reconcile: a prior exploration report tabulated historical geological estimates of up to ~11.23 Moz of gold and ~80.5 kt of molybdenum in veins.
These historical figures are not current mineral resources and are not part of the 2026 copper estimate. The next drilling campaign can include multi-element assays to test whether gold, molybdenum and iron add economic value.
Steep structural corridor with about half of the contained copper.
Integrated contact zone next to Loreto.
Vein exposed in underground workings and drilling.
Shallow-dipping domain to be extended by new drilling.
Saray sits in the Antofagasta-Mejillones copper belt, surrounded by producing mines, advanced projects and a working industrial port.
Transmission corridors cross the property.
ENGIE is developing a seawater system in Mejillones of up to 6,000 L/s.
Noracid plant, 2,060 t/day design capacity, key for leach processing.
Plus a US$130M concentrate terminal already operating in Mejillones Bay.
290 km regional corridor with a station planned near the project access.
No Indigenous communities or land overlap in the titles; no relocation needed.
Around 13–15 km from Saray, in the same corridor, Marimaca has shown how a copper project here can move from resource to feasibility, permits, financing and public-market value.
Same logistics platform, same access to Canadian capital, and a proven path from studies to permits and financing.
Marimaca is shown as regional proof of what is possible. It is not used as a direct valuation comparable for Saray.
Two work phases to confirm and expand the model, separate from any acquisition price or construction capital.
Database integration, topography, QA/QC, density and detailed field design.
4,000 m of diamond drilling, new assays, metallurgical testing and an updated model.
Total program: US$2.28 million, including 20% contingency. Initial leach testing on one sample dissolved 84.27% of the copper in 72 hours.
The owner is open to several structures. Final terms will be defined with the technical and legal documentation.
Transfer of the company or project assets on negotiated terms.
Entry with control, tied to a defined investment program.
Staged funding with negotiated rights and a later option.
Technical reports, drilling, assays, models, permits and titles are available for due diligence under confidentiality.
Source: Saray Integrated Technical Report (effective date September 7, 2026), Wong-Pinto et al. (2020), and public disclosures from Marimaca Copper, Capstone Copper and Chilean authorities as cited in the Saray executive report. Mineral resources are Inferred and are not mineral reserves; contained copper is stated in situ and does not represent production or revenue. Historical gold and molybdenum figures are not current resources. The metallurgical result applies to one laboratory sample. Marimaca figures are for regional context only. Distances are approximate. This page is a summary and does not replace independent technical, legal or financial review.